Fire Stop SP Mortar Application

FIRE STOP Mortar
For Large and Outdoor Openings


1.Scope
Generally in industries, Fire Stop Materials are used to control and retard the transmission of fire.
Different ways are available for sealing the Openings and coating the Cables. This installation procedure covers most of these ways, therefore, for having better installation use up-to-date methods to fit specific field and service condition.

2.Usage Of Products
    -Openings (Large sizes) even with cable tray and ladder and pipe. For resistance of fire up to 3 hours.

3.Equipment
   - Trowel
   - Mold, casting
   - Cutter
   - Pail

4.Product Preparation
All items must be kept in closed containers and stored temperatures between +5˚C to +45˚C.Shelf life for material is 15 months if kept tightly sealed.

5.Installation Instructions
   - Cleaning and dusting the coating's limitation of dust, oil and etc.
   - Wet surface of opening that must be filled with mortar.
   - Mix Fire Stop mortar with water according of technical data.
   - Fill opening with mortar. (usemold in place if required.)
   - Reinstall mortar in remaining place.


6.Curing Time

For recoating:
@ +10˚C approx8 hours    @ +20˚C approx7 hours    @ +30˚C approx6 hours

7.Safety
Fire Stop is based on water, so it doesn't have any skin's hurt and effect on environment.


This Installation Procedures represents our best knowledge. The information given here based on our field experience. We offer this information without any guarantee.
Please check for recent date. For additional information or details contact us:

№9, 3rd floor, 1575, Valiasr Ave. Upon Taleghani Ave., Tehran-Iran
Tel: (+9821) 88944246 , 88936166 , 88949528    Fax: (+9821) 88949529